Here you can be informed about
ATTSU Latest News
ATTSU continues increasing its presence in the Middle East by installing a new complete boiler room in an important Saudi company in Riyadh. This boiler room is equipped with a 2000 kg/h steam boiler at 8,9 bar design pressure which works with a LPG burner, two feed water pumps, automatic blowdown, TDS salinity device, water treatment plant and blowdown cooler. This boiler room has been installed in a 20’ container, which enables connections to the system outside in a “plug & play” mode.